估算/費(fèi)用估算:estimate/cost estimate;
估算類型:types of estimate;
詳細(xì)估算:是偏差幅度最小的估算,defined estimate;
設(shè)備估算:equipment estimate;
分析估算:analysis estimate;
報(bào)價(jià)估算:roposal estimate;
控制估算:control estimate;
初期控制估算:interim control estimate/initial control estimate
批準(zhǔn)的控制估算:initial approved cost
核定估算:check estimate
首次核定估算:first check estimate
二次核定估算:production check estimate
人工時(shí)估算:man hour estimate
材料費(fèi)用/直接材料費(fèi)用:material cost/direct material cost
設(shè)備費(fèi)用/設(shè)備購(gòu)買費(fèi)用:equipment cost/purchased cost of equipment
散裝材料費(fèi)用/散裝材料購(gòu)買費(fèi)用:bulk material cost/purchased cost of bulk material
施工費(fèi)用:construction cost
施工人工費(fèi)用:labor cost/construction force cost
設(shè)備安裝人工費(fèi)用:labor cost associated with equipment
散裝材料施工安裝人工費(fèi)用:labor cost associated with bulk materials
人工時(shí)估算定額:standard manhours
施工人工時(shí)估算定額:standard labor manhours
標(biāo)準(zhǔn)工時(shí)定額:standard hours
勞動(dòng)生產(chǎn)率:labor productivity/productivity factor/productivity ratio
修正的人工時(shí)估算值:adjusted manhours
人工時(shí)單價(jià):manhours rate
施工監(jiān)督費(fèi)用:cost of construction supervision
施工間接費(fèi)用:cost of contruction indirects
分包合同費(fèi)用/現(xiàn)場(chǎng)施工分包合同費(fèi)用:subcontract cost/field subcontract cost
公司本部費(fèi)用:home office cost
公司管理費(fèi)用:overhead
非工資費(fèi)用:non payroll
開車服務(wù)費(fèi)用:cost of start-up services
其他費(fèi)用:other cost
利潤(rùn)/預(yù)期利潤(rùn):profit/expected profit
服務(wù)酬金:service gains
風(fēng)險(xiǎn):risk
風(fēng)險(xiǎn)分析:risk analysis
風(fēng)險(xiǎn)備忘錄:risk memorandum
未可預(yù)見費(fèi):contingency
基本未可預(yù)見費(fèi):average contingency
最大風(fēng)險(xiǎn)未可預(yù)見費(fèi):maximum risk contingency
用戶變更/合同變更:cilent change/contract change
0571-88272987 88272986 | ||||
杭州翻譯公司,杭州翻譯公司哪個(gè)好,杭州翻譯公司收費(fèi)標(biāo)準(zhǔn) | ||||
浙公網(wǎng)安備 33010802003197號(hào) 浙ICP備15039916號(hào) |
||||